==== Syncoptic Log ==== Log for [[Project Syncoptic]] See also [[Project Syncoptic Status]] ==== Log ==== * 16.09 : Matrix Illuminated! Beautiful! Bad spots identified and fixed. * 16.09 : Electronics Refactored. * 16.09 : Event announcement sent. Flyers made by Maja! * 16.09 : Camera mounted! * 16.09 : Video tested! Beautiful Image. (Thank you, RF Concepts ) * 16.09 : Main room enclosure hangs. * 15.09 : Basic-X display program tested. * 15.09 : Serial indexing of bright LEDs fixed. * 15.09 : Sound Space Implemented * 14.09 : Floor Textile Partial Suspension Test Underway * 13.09 : Sky Hung under tension. * 12.09 : Consolidating basic-x display programs. * 12.09 : Serious floor hardware mounting by Lina and Gert. * 12.09 : Completed wiring of matrix. * 11.09 : Constellation wiki up. * 11.09 : Constellation Invitation Sent. * 11.09 : Event announcement up. * 11.09 : Solder matrix. * 11.09 : Attach floor mounting hardware. * 10.09 : Test frame stability. Consultation with Gert on Construction. Contract Gert to mount support hardware on walls. * 10.09 : Floor Bladders Arrived. Consulted with delivery person, Toure, who is studying communications. He would like to help us. * 09.09 : Reconsidering sound system spec due to budget. * 08.09 : LED Matrix Undergoing Physical Construction. * 08.09 : The Bright LEDs are now here!! * 08.09 : Open Constellation Design Initiative Begun. * 08.09 : LED control from BasicX successful!! * 08.09 : Tensile Floor Textile Construction Begun by Lina!!! * 08.09 : More Floor Textile+Water Prototyping. * 07.09 : More Spirited Discussion of the LED Mesh Structure! * 07.09 : Work with LED controller software. * 07.09 : Work on Fabric Floor * 07.09 : Development of candidate LED mesh structure design - summary at [[ Project Syncoptic Technology]] * 07.09 : Consultations with Lina and Gert on LED mesh structure. * 06.09 : Established details (date, time, audience) regarding public exhibition at and with FoAM * 05.09 : Serial data transmission from Max to Basic-X successful!!!!! * 05.09 : Obtained most remaining electronics * 05.09 : LEDs Deliverable Monday * 05.09 : Liquid Floor Ordered. Deliverable Monday. * 05.09 : Rescale project to 6m x 6m, reducing floor cost by 40%. * 05.09 : Began Testing Serial Communication Capability of BasicX * 05.09 : LED Controllers arrived * 04.09 : unlocked (used hardware reset to remove interrupt loop) * 04.09 : Liquid Floor Component Tested. (prior log available via long-term memory dump) ---- r7 - 17 Sep 2003 - 02:12 - Yon Visell ----