Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revisionBoth sides next revision
future_fabulators:windassisted [2015-12-20 21:34] timbofuture_fabulators:windassisted [2015-12-20 21:39] timbo
Line 52: Line 52:
  
 ==Vermon Freight Sail Project== ==Vermon Freight Sail Project==
-They built a ship in 2012 for the cost of 20,000 USD. This did shipping up and down the Vermont River in 2013-14. It was planning an expansion, but did not find backers. The Vermont project closed in July 2015: https://vermontsailfreightproject.wordpress.com/about/+They built a ship in 2012 for the materia cost of 20,000 USD, volunteer labour. This did shipping up and down the Vermont River in 2013-14. It was planning an expansion, but did not find backers. The Vermont project closed in July 2015: https://vermontsailfreightproject.wordpress.com/about/
  
 Some links to articles: http://www.willowell.org/programs/sail/ Some links to articles: http://www.willowell.org/programs/sail/
 +Article from Erik Andrus in the building stage of the proiject in April 2013,
 Longer article from end of 2013, after the maiden voyage: http://archive.burlingtonfreepress.com/article/20131124/GREEN01/311240006/Vermont-Sail-Freight-Project-highlights-old-shipping-methods-along-Lake-Champlain Longer article from end of 2013, after the maiden voyage: http://archive.burlingtonfreepress.com/article/20131124/GREEN01/311240006/Vermont-Sail-Freight-Project-highlights-old-shipping-methods-along-Lake-Champlain
  
  • future_fabulators/windassisted.txt
  • Last modified: 2024-06-05 11:03
  • by timbo