Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revisionBoth sides next revision | ||
hardened_bubbles [2008-01-22 18:15] – 62.166.51.71 | hardened_bubbles [2008-01-22 18:16] – 62.166.51.71 | ||
---|---|---|---|
Line 3: | Line 3: | ||
==== Hardened Bubbles ==== | ==== Hardened Bubbles ==== | ||
+ | |||
Line 47: | Line 48: | ||
automatically lifting all the necessary construction materials, which were distributed horizontally over a pneumatic form | automatically lifting all the necessary construction materials, which were distributed horizontally over a pneumatic form | ||
anchored to a circular ring beam, from ground level into an hemispherical dome. After the initial ground preparation was finished, | anchored to a circular ring beam, from ground level into an hemispherical dome. After the initial ground preparation was finished, | ||
- | that concrete thin shell structure was built in 60 minutes. http:// | + | that concrete thin shell structure was built in 60 minutes. http:// |
+ | |||
+ | ======== | ||
more inflatable image sections: [[Experience Inflatables]], | more inflatable image sections: [[Experience Inflatables]], | ||
or go back to; [[Cocky Eek]] | or go back to; [[Cocky Eek]] |