Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revisionBoth sides next revision | ||
leftover_inflatable_archive [2014-09-26 23:43] – cocky | leftover_inflatable_archive [2014-09-27 00:02] – cocky | ||
---|---|---|---|
Line 1: | Line 1: | ||
==== Leftover Inflatable Archive ==== | ==== Leftover Inflatable Archive ==== | ||
+ | |||
+ | |||
+ | |||
+ | {{: | ||
+ | {{bini2.jpg? | ||
+ | Bini Shell System, | ||
+ | automatically lifting all the necessary construction materials, which were distributed horizontally over a pneumatic form | ||
+ | anchored to a circular ring beam, from ground level into an hemispherical dome. After the initial ground preparation was finished, that concrete thin shell structure was built in 60 minutes. http:// | ||
{{Wave_UFO-2003.jpg? | {{Wave_UFO-2003.jpg? |