Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
manual:interviews:session1 [2016-08-22 12:34] michkamanual:interviews:session1 [2018-01-15 05:54] (current) 118.210.12.173
Line 1: Line 1:
-====FoAM v0 - Starlab Cultural Department - ([?] [?])====+====FoAM v0 - Starlab Cultural Department - (March 2000 September 2000)==== 
 + 
 +(NOTE: in need of editing and fact-checking)
  
 ===Members=== ===Members===
Line 12: Line 14:
      * Nik arrived just before bankruptcy      * Nik arrived just before bankruptcy
  
-====FoAM v1 - Starlab non-profit spin-off - ([?] Before october 2001 ? [?])====+====FoAM v1 - Starlab non-profit spin-off - (September 2000 June 2001)====
  
 ===Structure type=== ===Structure type===
Line 34: Line 36:
      * Maja helped design the mission of this spin-off, but they did not wanted her to be on the board      * Maja helped design the mission of this spin-off, but they did not wanted her to be on the board
  
-====FoAM v2 - Non-profit with possible commercial spin-offs - (After April 2002 [?] - 2010)===+====FoAM v2 - Non-profit with possible commercial spin-offs - (June 2001 March 2010)===
  
 ===Structure type=== ===Structure type===
Line 81: Line 83:
 ===FoAM v2.1 - (2001-2005)=== ===FoAM v2.1 - (2001-2005)===
  
-===Activities===+==Activities==
      * The two main focuses were around      * The two main focuses were around
        * Responsive environments        * Responsive environments
Line 89: Line 91:
      * No residencies at that time      * No residencies at that time
  
-===FoAM v2.- (2006-2009)===+===FoAM v2.- (2006-2009)===
  
-===Structure type===+==Structure type==
      * FoAM became an artlab      * FoAM became an artlab
        * Which is a funding-driven organization        * Which is a funding-driven organization
  
-===Mission / Purpose===+==Mission / Purpose==
  
      * After the LETHA project (presented at the Fuckup night), the focus was re-directed on environmentally/socially sustainable projects      * After the LETHA project (presented at the Fuckup night), the focus was re-directed on environmentally/socially sustainable projects
Line 110: Line 112:
    * In late 2009, FoAM became a lab for speculative culture    * In late 2009, FoAM became a lab for speculative culture
  
-===Activities===+==Activities==
        * The work was distributed between        * The work was distributed between
          * Projects          * Projects
Line 123: Line 125:
              * [? TBChecked] FoAM had to manage 5 times its operational budget              * [? TBChecked] FoAM had to manage 5 times its operational budget
  
-====FoAM v3 - Funding-induced structural change - (2010 - now)====+====FoAM v3 - Funding-induced structural change - (2010 - 2016)==== 
 + 
 +===Structure type===
  
    * A hierarchical structure was imposed by funding in 2010, extension of board + membership)    * A hierarchical structure was imposed by funding in 2010, extension of board + membership)
      * The funders requested       * The funders requested 
        * An extension of the board        * An extension of the board
-         * A larger general assembly +       * A larger general assembly 
-         * This change brought extreme excitement and hope, at the idea of finaly sharing benefits AND responsibility across more people (about 20 people involved in all studios) +     * This change brought extreme excitement and hope, at the idea of finaly sharing benefits AND responsibility across more people (about 20 people involved in all studios) 
-         * The idea was to map a circle-based flexible and hierarchical structure on the legal one, including the others studios in the structure+       * The idea was to map a circle-based flexible and hierarchical structure on the legal one, including the others studios in the structure
            * The structure intertwined the board and a core team            * The structure intertwined the board and a core team
              * The board included a member of the core team (Maja)              * The board included a member of the core team (Maja)
Line 194: Line 198:
        * Many comments of people saying “you cannot let this happen”        * Many comments of people saying “you cannot let this happen”
      * This is when the Resilients project started in June 2011      * This is when the Resilients project started in June 2011
 +
 +===Mission/Purpose & Activities===
  
    * From late 2009 onwards, FoAM Brussels is still running 100% in the “nurturing regime” - almost no “own work”    * From late 2009 onwards, FoAM Brussels is still running 100% in the “nurturing regime” - almost no “own work”
Line 213: Line 219:
                  * All partners were satisfied too                  * All partners were satisfied too
  
-   * The audit came ([?] for Grig ?) in 2012, and induced a breaking point +   * The audit came (for Grig) in 2012, and induced a breaking point 
-     * One year and half have been spent on the audit ([?] TBChecked+     * One year and half have been spent on the audit (March 2012-August 2013
-     * The first report from the auditors was asking 600 k€ back ([?] TBChecked) +     * The first report from the auditors was asking ~600 k€ back 
-     * At the end of the process, they were asking “only” 300 k€ back, but after a lot of work, stress, etc ([?] TBChecked)+     * At the end of the process, they were asking “only” 300 k€ back, but after a lot of work, stress, etc
  
    * In 2013, the decision was made to actively split nurturing activities and own work    * In 2013, the decision was made to actively split nurturing activities and own work
  • manual/interviews/session1.1471869292.txt.gz
  • Last modified: 2016-08-22 12:34
  • by michka