Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revisionBoth sides next revision | ||
powered_by_wind [2008-02-02 13:02] – 62.166.51.71 | powered_by_wind [2008-07-21 14:11] – 62.166.51.71 | ||
---|---|---|---|
Line 3: | Line 3: | ||
==== Powered By Wind ==== | ==== Powered By Wind ==== | ||
+ | |||
+ | |||
Line 60: | Line 62: | ||
{{758-0.jpg? | {{758-0.jpg? | ||
{{66m.jpg? | {{66m.jpg? | ||
- | -Propeller, | + | 1. Propeller, Men & Machines, 010 publishers\\ |
Chesterton Windmill, South-East Warwickshire. | Chesterton Windmill, South-East Warwickshire. | ||
The mill was built in the years 1632- 1633 | The mill was built in the years 1632- 1633 | ||
Line 94: | Line 96: | ||
Casa basica: Martin Ruiz de Azua, 1999\\ | Casa basica: Martin Ruiz de Azua, 1999\\ | ||
Polyester, 6' 6 3/4" x 6' 6 3/4" x 6' 6 3/4" (200 x 200 x 200 cm)\\ | Polyester, 6' 6 3/4" x 6' 6 3/4" x 6' 6 3/4" (200 x 200 x 200 cm)\\ | ||
- | \\ | + | |
+ | |||
+ | \\{{: | ||
+ | Dre wapenaar | ||
+ | |||
{{: | {{: | ||
Line 113: | Line 120: | ||
He added: “The sail looks like a bird dipping its beak into the water, which will be much less of a blot on this beautiful and unblemished landscape. | He added: “The sail looks like a bird dipping its beak into the water, which will be much less of a blot on this beautiful and unblemished landscape. | ||
“But it is also highly effective at capturing the wind because it replicates the work of a dam and doesn’t let the wind escape in the way it does using traditional propellers.” | “But it is also highly effective at capturing the wind because it replicates the work of a dam and doesn’t let the wind escape in the way it does using traditional propellers.” | ||
- | If granted planning, the dam will be 25m high and boast a 75m span when it goes on site next year. The practice is also looking at applying for planning permission for a similar scheme at another gorge, further up the valley. | + | If granted planning, the dam will be 25m high and boast a 75m span when it goes on site next year. The practice is also looking at applying for planning permission for a similar scheme at another gorge, further up the valley.\\ |
- | source: http:// | + | source: http:// |
+ | |||
+ | ====== | ||