Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | |||
resilients:subak_construction_notes [2013-01-30 09:22] – added weight / registration issues. timbo | resilients:subak_construction_notes [2013-02-13 22:43] (current) – alkan | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | === Subak Construction Notes === | + | ==== Subak Construction Notes ==== |
The Subak was constructed from an old sheet steel fishing Zille and a discarded windsurfer connected as a catamaran. We carved a simple pole mast with no standing rigging from a 10cm square post left over from another project. The Chinese Lug, or Junk sail was made from locally produced cotton and died with coffee grounds left over from a local breakfast spot, Cafe Maier. The boom and yard came from former floor struts from a low stage. The battens were bamboo cut from a colleague' | The Subak was constructed from an old sheet steel fishing Zille and a discarded windsurfer connected as a catamaran. We carved a simple pole mast with no standing rigging from a 10cm square post left over from another project. The Chinese Lug, or Junk sail was made from locally produced cotton and died with coffee grounds left over from a local breakfast spot, Cafe Maier. The boom and yard came from former floor struts from a low stage. The battens were bamboo cut from a colleague' |